Complete project of investment territory

Complete project of investment territory

1.     Architectural part

1.1.  Vertical plans, sections, facades, general plan, visual renders

1.2.  Specifications for doors and windows

1.3. Specifications for the façade

1.4. Project for construction organization (so called PCO) 

1.5.  Architectural expertise (Resolution No. 41, fire safety)

1.6.  Agreement with 112

1.7.  Topographic plan

1.8. Development of topographic map (in the radius of 50 m or in a quarter)  

1.9.  Survey for definition of city construction parameters (in the radius of 50 m or in a quarter) 

1.10.  Photographing the project area using a drone (aerial fixation)

1.11Engineering  geology   

1.12  Engineering and geological survey

1.13. Expertise for engineering and geological part

1.14. Landscape design
   

2.    Constructional part  

2.1.  Constructional project

2.2.  Expert conclusion of construction project

 3.     Urban architecture

3.1.  Development of detailed development plan (DDP)

3.2.  Changing the functional and zonal purpose of investment (project) land plots and determining the parameters of the city's development.

4.     Engineering communication

4.1.  Water supply project

4.2.  Sewage project

4.3. Power supply project

4.4.  Rainwater prevention project  on the building

4.5. Heating and cooling design of the building  

4.6. Swimming pool design

4.7. Design for weak currents (internet, internal and external telephone connections, surveillance cameras)

5.     Interior design

5.1. Arrangement of the internal layout of the house with dimensions and 3D visualization 

5.2. Dimensions and number of switches and sockets

5.3.  Marking of reverse switches, if any

5.4. Ceiling dimensions, number of ceiling and wall lights with dimensions 

5.5.  Water supply system, number of points with dimensions

5.6. The number of gas points with dimensions corresponding to each detail drawn on it, with a code (blank) to be purchased  

6.     Design of the electrical and technical part of the cable laying of power transmission towers and overhead power lines

 7.    Preparation of project and construction estimates and  construction organization